Archives: Documents
-

2018 SDG7 Tracking: The Energy Progress Report
-

Levers of Change: How Global Trends Impact Gender Equality and Social Inclusion in Access to Sustainable Energy
-

ETHIOPIA – Beyond Connections: Energy Access Diagnostic Report Based on the Multi-Tier Framework
The MTF survey is a global baseline survey on household access to electricity and clean cooking, which goes beyond the binary approach to look at access as a spectrum of service levels experienced by households. Resources included are raw data, codebook, questionnaires, sampling strategy document, and country diagnostic report. Formats include zip file (which includes…
-

For Clean Cooking Energy in Rural India: Women’s Empowerment and LPG as Prestige Good
-

Situation Analysis of Gender and Sustainable Energy in the East African Community 2018
-

Accelerating SDG 7 achievement: Policy briefs in support of the first SDG 7 review at the UN High-Level Political Forum 2018
-
Solar powered electricity access: Implications for women’s empowerment in rural Kenya
This paper examines the gendered implications of various types of electricity access in rural Kenya spanning from the central grid to solar-based systems such as community projects, village scale supply and private solar home systems (SHS). Drawing on material collected in Homa Bay and Kitui counties in 2016, the paper examines the gendered set-up, organisation…
-

Best practices for education and training to advance women’s energy entrepreneurship
-

Best practices for education and training to advance women’s energy entrepreneurship
-

Increasing Access to Clean Lighting and Promoting Female Entrepreneurship in Rwanda
-

CAMBODIA – Beyond Connections: Energy Access Diagnostic Report Based on the Multi-Tier Framework
The MTF survey is a global baseline survey on household access to electricity and clean cooking, which goes beyond the binary approach to look at access as a spectrum of service levels experienced by households. Resources included are raw data, codebook, questionnaires, sampling strategy document, and country diagnostic report. Formats include zip file (which includes…
-

Energizing Equality: sub-Saharan Africa’s integration of gender equality principles in national energy policies and frameworks

